Prices

Prices are prepared on individual request for quotation and regarding to determined projects. The below prices are informative only

Main activities:
Scaffolding prices includes material and labour costs.

A. DISTRIBUTION AND CONSTRUCTION OF STEEL TRUSSING FIRE-BREAK COATINGS

  • E30 steel fire-break coating: from 2100 HUF/m2
  • E45 steel fire-break coating: from 2600 HUF/m2
  • E60 steel fire-break coating: from 4950 HUF/m2
  • E60 steel fire-break diffused coating: from 3700-5000 HUF/m2
  • E90 steel fire-break diffused coating: from 5300-6500 HUF/m2
  • E120 steel fire-break diffused coating: from 6700-7500 HUF/m2
  • E180 steel fire-break diffused coating: from 8000-10.000 HUF/m2
  • Trapeze plate E30 coating: 3200-4500 HUF

B. FIRE SECTION BARRIER FIRE-BREAK SEALING AND CLOSING

1. E30, E60 E90 fire section closing

8000-12.000 HUF /m2

2. Fire-breaking cuffs for plastic tubes:

 50 3.700 - 4.700,- HUF + VAT
 75 4.940 - 6.240,- HUF + VAT
90 5.800 - 6.800,- HUF + VAT
110 7.300 - 8.200,- HUF + VAT
125 9.500 - 10.200,- HUF + VAT
160 9.800 - 11.500,- HUF + VAT
200 17.000 - 18.200,- HUF + VAT
250 28.500 - 29.800,- HUF + VAT

Cost of installation: 1.800,-HUF/piece+VAT

3. Point-selaing preparation with HILTI CP 601 material:

Point-width:
1 cm: 1.500-1.950,- HUF / rm + VAT
2 cm: 3.200-4.600,- HUF / rm + VAT
3 cm: 5.800,- HUF / rm + VAT

4. Closing with PS fireblocking sack:

PS I. sack: 2.800-3.300,- HUF / piece + VAT
PS II. sack:
1.900-2.400,- HUF / piece + VAT
PS III. sack: 
1.700-2.100,- HUF / piece + VAT

Cost of setting is 30% of materials.

C. PROPER DESIGN AND CONSTRUCTION OF LOW CURRENT FIRE DETECTORS AND ALARMS

DETECTOMAT system

D. SPRINKLER INSTALLATION

Viking, Tyco types

E. SKYLIGHTS:

steel, aluminium glass 
aluminium, policarbonate
Schücco, Indu Light types

F. INSTALLATION OF FIRE-BREAK, FIREPROOF GATES AND COMPLETE CONTROL UNITS, FIRE PROTECTION INSTALLATION CONSULTANCY

G. MAINTENANCE OF FIRE PROTECTION SYSTEMS

maintenance of sprinkler, fire detector, heat and smoke deflectors

H. INTERIOR DECORATION MATERIALS (WOOD, TEXTILE, ETC) COATINGS, TEXTILE IGNITION RETARDER COATING AND SEALINGS.

I. TRACKING OF FIRE PROTECTION SYSTEM FROM THE DESIGN TO PUT IN PRACTICE MATERIALIZED BUILDING

 

DESIGN OF FIRE PROTECTION SYSTEM:

1. Preparation of fire protection system design:

Principled authorization, authorization, final contruction drawing

2. Fire protection supervision of authorized and/or final construction drawing

Harmonization of modifications, searching for cost saving solutions

3. Harmonization with authorities as above detailed

National Directorate General for Disaster Management, Fire Protection Department, ÉMI NON-PROFIT LIMITED LIABILITY COMPANY FOR QUALITY CONTROL AND INNOVATION IN BUILDING and certification administration

4. Track and control of fire protection system up to final construction

For having the successful Fire Protection authorized license.